XE NAM NOY 6
Location: Namtuad Village, Paksong District, Champasak Province
INFORMATION
The Xenamnoy 6 Hydroelectric power project it is located in the Champrasak Province, Lao PDR. the construction time period from 11 November 2013 to 20 October 2015 in which an installed capacity of 5.0 MW. However, According to the employer's requirement and instruction, the installed capacity is (2x2.50MW) with the annual energy output 27 GWH/y, the contractual function is the Design, Build, Transfer to the Namngiep 3A Electric co., Ltd is on behalf of the Phongsubthavy Power Co., Ltd.