Namngiep 3A

Nam Ngiep 3A HPP

Location: Xiengkuang Province, Lao PDR
Icon PSG-38Icon-38

Install Capacity: 44 MW

Icon PSG-09Icon-09

Number of Generator: 5 Unit

Icon PSG-05Icon-05

Capacity: 2.5 MW / Unit & 13 MW / Unit

Icon PSG-04Icon-04

Generation: 159.67 GWh / Year

INFORMATION

The Namngiep 3A Hydroelectric power project it is located in the Xiengkuang Province, Lao PDR. the construction time period from 14 May 2011 to 20 August 2014 in which an installed capacity of 44 MW. However, According to the employer's requirement and instruction, the installed capacity is (2x2.50MW & 3x13MW) with the annual energy output 159.67 GWH/y, the contractual function is the Design, Build, Transfer to the Namngiep 3A Electric co., Ltd is on behalf of the Phongsubthavy Power Co., Ltd.