Nam Ngiep 3A HPP
Location: Xiengkuang Province, Lao PDR
INFORMATION
The Namngiep 3A Hydroelectric power project it is located in the Xiengkuang Province, Lao PDR. the construction time period from 14 May 2011 to 20 August 2014 in which an installed capacity of 44 MW. However, According to the employer's requirement and instruction, the installed capacity is (2x2.50MW & 3x13MW) with the annual energy output 159.67 GWH/y, the contractual function is the Design, Build, Transfer to the Namngiep 3A Electric co., Ltd is on behalf of the Phongsubthavy Power Co., Ltd.